The full redesign of McGuinness Boulevard in Greenpoint is done. The city announced on Nov. 13 that parking-protected bike lanes now run the whole length of the boulevard, from Meeker Avenue to the Pulaski Bridge, completing a project that Greenpoint residents and parents had pushed for over several years.

What the street looks like now

McGuinness now has, in each direction:

  • One travel lane for cars and trucks
  • A bike lane, protected by a lane of parked cars
  • A curbside lane for parking and loading

According to the city, the new layout shortens the distance people have to walk to cross, slows drivers as they turn and discourages reckless driving. The boulevard is a main cycling link between Brooklyn and Queens, used by more than 4,000 riders a day in the summer months.

How it got here

Neighbors organized for years for a safer boulevard, led by the coalition Make McGuinness Safe and by parents at P.S. 110, after the teacher Matthew Jensen was killed crossing the street. In January the city recommitted to the original full redesign, construction began on May 27, and the city said it would be finished before winter.

A mural at Father Studzinski Square

The redesign also brought public art. In June the Department of Transportation finished a mural at Father Studzinski Square on McGuinness, covering 1,600 square feet of asphalt and 80 feet of concrete bike barrier. The artist, Kevin Cincotta, built the design from conversations with neighbors at local events, and it draws on Greenpoint's past as marshland, the plants and animals that lived there, and the neighborhood's Polish heritage.

Using it

The protected lanes connect at the north end to the Pulaski Bridge into Long Island City, and at the south end to Meeker Avenue. The G train runs beneath the area, with stops at Nassau Avenue and Greenpoint Avenue a few blocks west of the boulevard.

Sources